
Guinness World Record
Holds the record for the fabrication, loadout and installation of the "Heaviest single-module topside on a fixed steel jacket"


+2,100,000 sqm
Total Fabrication Area
+100,000 metric ton
Annual Fabrication Capacity
107.03 million
Safe Man Hours in 2025

Holds the record for the fabrication, loadout and installation of the "Heaviest single-module topside on a fixed steel jacket"
51
Structures
80,000
Metric tons

165,000
Metric Tons of steel produced in Yards.

State-of-the-Art Robotic welding and COBOT Welding stations, for welding small to heavy components (up to 3 metric tons)

Real Time Labor Tracking System β Alerts and Tracking
AI-driven HSE site safety analyzer implemented at Heavy Shop facilities with real-time personnel tracking with automated alerts

Industry leading cloud-connected equipment monitoring and AI-driven insights for : utilization, productivity, fuel consumption

Proximity Warning Alert System installed onto heavy mobile equipment